|
permits and applications
home
---
bpd
inspections
---
local
plan review
---
Residential
Code Overview ---
General Administrative Rules 675 IAC 12 ---
adopted
state building codes
---
state
code amendments ---
BPD
home
---
Other Links
|
|
Water
Tap and Meter Permits
Prerequisites
-
Must be
Contractor or Homeowner to pull permit
-
Must be
within the City of Auburn
-
Contact
Water Department-Where Required
The
Process
1)
Obtain Application from Building Department or click on link
2)Contact
Auburn Water Department for Proper Tap and/or Meter size.
Obtain sizes on permit and authorizing signature.
3)Submit signed
Application
(Acrobat Reader
Required)to Department of Building,
Planning & Development
2)
Pay Correct Fee
3)
Receive Permit
4) Contact
Auburn Water Department for Equipment and Service
5)
Service is connected.
*Separate
Driveway Approach permits are required from Engineering
Department
Fees
Water Tap Fees
*Plus
the actual cost of the meter as purchased from Water
Department
Water
Meter Fees
-
$125
/ ¾
Inch
-
$200
/ 1
Inch
Staff
Contacts
|